Arc flash hazards can result due to various reasons, including dropped tools, inadvertent contact with live conductors, build-up of conductive dust, corrosion, and ineffective safety procedures. Arcs are produced when electrical current flows through an ionized air channel as a result flashover or a short circuit. The result could be significant heating which has the potential to cause severe burns and injuries. The electrical industry in Australia is acknowledging that arcing faults can:

  • That the release of dangerous levels of radiant heat energy can cause severe burns and ignition of clothing, the result may be a treatment that requires several years of skin grafting and rehabilitation or often fatalities.
  • Spray droplets of molten metal, with the explosion distributing the molten metal and shrapnel produced by the arc over a large area.
  • Produce high pressure waves (blast) that can potentially throw workers across the room and knock them off ladders etc...
  • Cause permeant hearing loss due to the high intensity sound waves associated with the arc.

Developing and implementing an ongoing arc flash hazard program which meets the new regulations noted in NFPA 70E, IEEE-1584, and the current WHS regulation can be challenging. Rule-of-thumb methods could result in both unnecessary worker exposures to hazards from under protection and significant lost plant productivity due to overprotection.

Today the electrical industry in Australia are recognizing the benefits of obtaining accurate arc flash hazard data. Recently, arc flash safety Committee recommended that arc flash calculations should be completed in conjunction with short circuit calculations and protective device coordination to help ensure the most accurate arc flash hazard results. Interested in more information contact us on 1300 206 964 or email: [email protected]

High Voltage Installations

Battery System Testing: A Comprehensive Guide

This guide provides general background information on battery system testing. It is intended as a resource and should not be relied upon for the correctness or applicability to any specific situation. Brandis Hire disclaims any liability for testing conducted, results obtained, or any related effects or outcomes arising from this guide.

High Voltage Installations

Auditing High Voltage Installations

Auditing high voltage (HV) installations is important in ensuring the safety, reliability, and compliance of power distribution systems. Attention to detail is vital in demanding and mission critical environments, such as power generation, health care, manufacturing, mining and utilities. The primary goal of an audit is to evaluate and manage the risks associated with the plant operations, personnel safety and statutory compliance. According to the legislation, all new and altered HV installations must undergo an audit before they can be energized.

VLF-Testing.jpeg

VLF Cable Testing

DC high voltage testing has been the accepted method to determine the serviceability of HV cables. DC high potential (hipot) tests worked well as a withstand assessment test for paper, oil and plastic insulated cables and was used to perform factory tests, acceptance tests and maintenance tests. Recent field data and research has shown DC hipot testing might be damaging and can cause extruded cables especially for aged cross-linked polyethylene (XLPE) insulated cable.

Winding Resistance Test

Winding Resistance Test of Transformer

This test is performed as a part of overall transformer commissioning which helps pick out any design errors, poor contacts, loose connections and effects rendered as a result of harsh environmental conditions. However, most importantly this test quantifies the losses within the windings. An expression explaining the same is shown below. The importance and necessity of conducting this test cannot be overemphasised. Windings within the transformer are designed to operate on a certain amperage and voltage level which also needs to be fairly balanced with amongst all windings.

Earthing Systems

Earthing Systems: Testing Procedure and Method

Earthing, also known as grounding, is a fundamental component of electrical systems, ensuring the safety and functionality of electrical installations. It involves connecting parts of an electrical system to the ground, providing a path for fault currents to flow safely into the earth. This minimizes the risk of electrical shock, equipment damage, and fire hazards. Proper earthing is crucial for both industrial and residential electrical systems, and it requires precise methods and procedures for effective implementation.

Arc Flash Hazards and Why it Needs to be Addressed - HV Blog

Arc Flash Hazards and Why it Needs to be Addressed

Arc flash hazards can result due to various reasons, including dropped tools, inadvertent contact with live conductors, build-up of conductive dust, corrosion, and ineffective safety procedures. Arcs are produced when electrical current flows through an ionized air channel as a result flashover or a short circuit. The result could be significant heating which has the potential to cause severe burns and injuries.

Solar Panel Types – A Comparison HV News

Solar Panel Types – A Comparison

There are three common types of cell technologies, used in solar power generation in Australia. Monocrystalline cells are made from a thin silicon wafer that is cut from a single large silicon crystal. The cells are then doped and current carrying conductors are either printed on cells or within the surface of the cell itself. Generally monocrystalline cells have the highest efficiency, but this comes at a price, increasing your payback period (still within 5 years). A number of manufacturers make monocrystalline panels, including BP Solar and Sharp Solar.

Electrical Earthing: Are you compliant?

Electrical Earthing: Are you compliant?

Does your electrical installation comply with AS3000 & AS2067? Do you know the quickest, easiest and most cost-effective way to become compliant? Over the past decade Integral Power has undertaken earthing surveys across Australia. In recent months our High Voltage Earthing team has been extremely busy undertaking HV earthing surveys at numerous industrial sites. In these surveys we ensure that step and touch potentials arising from a fault are kept within the safe range. Surveys also ensure compliance with the AS3000 and AS2067.